Project overview
Itenbau AG lifted the high platform of the Arth Rigibahn to 2 metres for refurbishment. Later the 250-tonne platform was lowered again by 1.30 metres.
Challenges
The 2-metre lift was carried out in only 3¾ hours, including overhead-line construction.