Arosa, 2018

Detached house Arosa

Project overview

Itenbau AG carried out the excavation shoring for a new build that had tilted by about 8 centimetres on the downhill side. The detached house was stabilised and aligned using the press-pile System Iten AG.

Challenges All work was carried out on very steep terrain.