Project overview
Itenbau AG carried out the lifting and sliding of the 600-tonne Schleusentobel bridge. The bridge had to be raised by 50 centimetres so that formwork could be struck. The transverse sliding distance was 15 metres.
Challenges
The particular challenge on this assignment was the winter conditions.