Project overview
Itenbau AG carried out the realignment for the camp of the SWISSINT training centre. A new foundation was built for containers and training barracks. Timber barracks had to be stabilised and made suitable for relocation with a steel corset for the mobile crane.
Challenges
There was practically no space to work under the barracks.