Project overview Itenbau AG carried out the horizontal alignment and stabilisation of an apartment building that had tilted on one side. The entire building was set on press piles for this purpose.
Challenges The existing, non-load-bearing piling had to be lifted as well. The building remained habitable throughout the construction period, including during lifting.