Luzern, 2018

Listed house Lucerne

Project overview

For a conversion and the new construction of an underground car park, the 920-tonne listed house had to be shored. This was achieved by installing a strutting slab on bored piles with prestressing.

Challenges

Particular caution is always required on listed buildings.